Tip: The Coffee Freight Cars can be pulled by the Mogul locomotive, which can pull as many as three cars. Save your heavier Decapods for mining Coal and harvesting Lumber.
Note: In the introduction to Coffee Rush the concept of varying times for varying lengths of distance is introduced. For instance a level three upgrade run from Berryport to any Warehouse with the same train can take between 7-14 hours depending on the distance.
Note that all times are relative and may apply to some routes more than others.
A select number of Standard Encounters are also present during the Event, such as "Machine Shop" (which costs on Loss).
Structures[]
"Connect Espresso Warehouses with a bridge"
Bridge Construction: 650 200 100 06:00:00
"Build a tunnel connecting Brewston to a Packaging Facility"
Tunnel Construction: 350 150 20 03:30:00
Bridge (Americano to Pkg facility): 200 50 01:30:00
Rewards[]
Reward based upon the number of Coffee Bags Transported before the 8-day Timer expires:
Reward
3/2016
Reward
8/2016
Reward 4/2017
400
2
2
2
600
1,000
1,000
1,000
800
3
1
1
1,300
3
3
3
2,500
Ironsides[]
A sleek, beautiful, and above all powerful locomotive! It pulls the most Carriages, never breaks and Requires No Room in the Depot! It cannot be Crafted or earned anywhere else nor can it be Upgraded.